Ferrybridge Next Generation Power Station
Providing flexible capacity for a net zero future
SSE Thermal is committed to continuing the proud energy production heritage at Ferrybridge by actively developing Ferrybridge Next Generation Power Station.
In line with our vision for a net-zero future, SSE Thermal has committed to only build power stations with a clear route to decarbonisation.
Ferrybridge Next Generation Power Station will be designed to run on 100% hydrogen fuel from the outset of operations, but could also run on natural gas or a blend of natural gas and hydrogen until a resilient hydrogen supply becomes available.
The Proposed Development is subject to ongoing technical, environmental and engineering studies.
Statement of Community Consultation
Ferrybridge Next Generation Power Station will hold a statutory consultation between 5 September and 6 October.
You can learn more about how we will consult with the local community in our Statement of Community Consultation (SoCC), available to download here or view an electronic or hard copy at one of the deposit locations below:
Location | Address | Opening times |
North Yorkshire Council Offices | Civic Centre, Doncaster Road, Selby, | Monday: 09:30 - 17:00 |
Wakefield Council Offices | Town Hall, | Monday: 09:00 - 17:00 |
Pontefract Library | Shoemarket, Pontefract, | Monday: 9:30 - 19:00 |
Airedale Library | The Airedale Centre, The Square, Castleford, | Monday: 9:30 - 17:00 |
Castleford Library | Carlton Street, | Monday: 09:00 - 17:00 |
Statutory consultation documents will be available to download from this webpage and at the community deposit locations listed above from Friday, 5 September 2025.
Contact us:
Rachel Palmer, Stakeholder Engagement Manager
Email: [email protected]
Telephone: 07467 397742